Canada Post Mail System Infrastructure

canadapost

Williams Engineering (WE) worked as Prime Consultant for the Operational Transitional Work and Integrated Mail Sorting System installation projects at Canada Post’s Edmonton Mail Processing Plant.

Eastlink Centre

14059.00 10.06.2011 (9)

The Eastlink Centre features a wide variety of water activities for all ages: an adventure river, water playground, waterslides, Flow Rider surfing machine, a 50-metre competitive pool for a variety of uses (synchronized swimming, kayaking, lane swimming, water polo, scuba diving), a 25-metre warm water pool, and a barrier-free access pool for youth and senior programs.

École Allain St-Cyr

ecole allain st cyr

Williams Engineering (WE) has built upon a long-standing relationship with École Allain St-Cyr that began in 1998 to provide engineering design and consultation services.

Edmonton Valley Zoo

wec edmonton zoo arctic shore (7)

The Arctic Shores Polar Extremes Exhibit, which opened to the public in March 2012, featured indoor and outdoor pools for seal and sea lion species and exhibits for arctic ground squirrels and arctic foxes in a replicated arctic landscape.

Greenstone Building

greenstone (2)

A plan for a Government of Canada Building was put into place in 2002 to improve the delivery of services to communities in the Northwest Territories and is a positive addition to Yellowknife City’s downtown core. Using LEED® guidelines, the building provides healthy and energy-efficient components that align with a typical Yellowknife commercial building construction budget.

Capitol Theatre in Fort Edmonton Park

capitoltheatre edmonton jimdobiephotography 20 8026780123 o

Located in Fort Edmonton Park, the new Capitol Theatre blends modern construction with authentic elements and character from the original theatre that was constructed circa 1929. Williams Engineering was a key member of the building design team for the re-creation of this classic theatre and provided both mechanical and electrical services.