Edmonton Islamic Academy
The Islamic Academy of Edmonton is a triumph of collaboration that provides traditional education with a modern sensibility for more than 1,000 students from kindergarten to grade twelve.
The Islamic Academy of Edmonton is a triumph of collaboration that provides traditional education with a modern sensibility for more than 1,000 students from kindergarten to grade twelve.
In conjunction with the Sirri Island project, the petroleum processing plant installation completed at Shanul, Iran, was undertaken for Thermo Design Engineering Ltd.
Williams Engineering (WE) provided significant consulting services for the Yellowknife Multiplex, which houses a mixture of gymnasiums, gymnastics facilities, ice arenas, and shower rooms for each activity, totalling 9,523 square metres.
Williams Engineering (WE) provided consulting engineering services for the Stanton Territorial Hospital Upgrades in Yellowknife, Northwest Territories.
The Repsol Sports Centre or formally known as the Talisman Centre, built in 1983, spans approximately 25,000 square feet of cardio and weight training space, has an Olympic calibre dive tank, a 200-metre running track, a steam room, and an on-site cafe.
Williams Engineering (WE) provided structural, mechanical, and electrical engineering and consulting for a new air terminal named the Tuktoyaktuk Air Terminal with Nadji Architects and the Government of the Northwest Territories.
Williams Engineering (WE) provided mechanical, electrical and structural engineering services for the renovations of Yellowknife’s City Hall lobby, Council Chamber, and reception area to the Mayor’s office. Yellowknife’s City Hall is centrally located in the downtown core along Frame Lake.
Williams Engineering (WE) worked as Prime Consultant for the Operational Transitional Work and Integrated Mail Sorting System installation projects at Canada Post’s Edmonton Mail Processing Plant.
Williams Engineering (WE) has built upon a long-standing relationship with École Allain St-Cyr that began in 1998 to provide engineering design and consultation services.
A plan for a Government of Canada Building was put into place in 2002 to improve the delivery of services to communities in the Northwest Territories and is a positive addition to Yellowknife City’s downtown core. Using LEED® guidelines, the building provides healthy and energy-efficient components that align with a typical Yellowknife commercial building construction budget.
Williams Engineering (WE) provided Suncor with design services to construct a new operational complex in Fort McMurray which includes an office building, lube warehouse, and truck shop.
Being the largest and most comprehensive communication network of its kind in Canada, Williams Engineering (WE) is honoured to have provided project management and civil, structural, electrical, and geotechnical engineering services to the Alberta First Responders Radio Communications System (AFRRCS).