Lois Hole Library
Lois Hole Library is an important milestone in community development and sustainable design in Edmonton and is a tribute to the memory of former Lieutenant Governor Lois Hole.
Lois Hole Library is an important milestone in community development and sustainable design in Edmonton and is a tribute to the memory of former Lieutenant Governor Lois Hole.
The Meadows Community Recreation Centre and Library is a 20,900-square-metre facility which includes an aquatic complex, a twin-sheet ice arena, a gymnasium, a two-level fitness area with an indoor track, community multipurpose rooms, and a 1400-square-metre space for the Edmonton Public Library.
Meadows Community Recreation Centre and Library Read More »
Williams Engineering (WE) provided significant consulting services for the Yellowknife Multiplex, which houses a mixture of gymnasiums, gymnastics facilities, ice arenas, and shower rooms for each activity, totalling 9,523 square metres.
Yellowknife Multiplex Read More »
The striking new Mill Woods Library, Seniors and Multicultural Facility is a two-storey, dual-functioning facility that consists of over 50,000 square feet of total floor area.
Mill Woods Library, Seniors, and Multicultural Facility Read More »
To support the recent population increase in Alberta, 18 new schools were constructed in Edmonton and Calgary. Williams Engineering (WE) designed six different school models that were adapted for all 18 projects.
Williams Engineering (WE) provided consulting engineering services for the Stanton Territorial Hospital Upgrades in Yellowknife, Northwest Territories.
Stanton Territorial Hospital Read More »
The Repsol Sports Centre or formally known as the Talisman Centre, built in 1983, spans approximately 25,000 square feet of cardio and weight training space, has an Olympic calibre dive tank, a 200-metre running track, a steam room, and an on-site cafe.
Repsol Sports Centre (Talisman Centre) Read More »
Williams Engineering (WE) provided structural, mechanical, and electrical engineering and consulting for a new air terminal named the Tuktoyaktuk Air Terminal with Nadji Architects and the Government of the Northwest Territories.
Tuktoyaktuk Air Terminal Building Read More »
Williams Engineering (WE) provided mechanical, electrical and structural engineering services for the renovations of Yellowknife’s City Hall lobby, Council Chamber, and reception area to the Mayor’s office. Yellowknife’s City Hall is centrally located in the downtown core along Frame Lake.
Yellowknife City Hall Lobby and Council Chambers Read More »
The project for SMART Technologies Inc. involved the research, design, and manufacturing of telecommunications equipment. Williams Engineering (WE) worked with GEC Architecture on this 27,000 m2 complex at the University of Calgary Research Park.
SMART Technologies Inc. Read More »
Williams Engineering (WE) partnered with CMA Architecture on build a new Smashburger facility located in the McKenzie Towne Centre neighbourhood in Calgary, Alberta. WE provided mechanical and electrical consulting engineering services to renovate the existing space into the franchise restaurant.
Triton Centre is a two-storey mixed-use commercial and retail building measuring 55,319 square feet with on-grade parking. Both spaces were subdivided into smaller units allowing for several tenants to utilize the building.